New Building Meeting (April 15, 2026). Back to all new building meetings.

Meeting Notes

Key Takeaways/Action Items:

  1. Secure a lawyer to review project and create a purchase agreement for Lester St
  2. Business plan created for Makerspace. Current funds, current outflow, projected
  3. Contact USDA/Brownfield for loan options
  4. Investigate partnerships with local organizations for property
  5. Complete Contractor layouts for estimated building prices

Notes:

  • Discussed funding amounts currently in bank accounts (balances redacted)
  • Building Layout/Logistics
    • Lot determined to be 141’ x 270’
    • Power easement on north side of lot from power pole, 10’ each side of pole
    • Possibly swap bathroom in main building from corner to Storage area
    • Remove hallway and move meeting room to front of building
    • Separate entrances for main meeting room (rentable) and Makerspace/Artist Studios
    • Rename artist studios to flex rooms
    • Project storage areas determined. Pallet racks/cubbies, etc
    • Add dirty bathroom with sink/drain for each building for project cleanup
    • Determine how many bathrooms are needed to meet code requirements for occupancy
    • Flip Mechanical HVAC room in woodshop to bottom of building so HVAC systems close together for service
    • Min 10’ doors or 12’ with bollards for all overheads in wood/metal buildings
    • Add project storage (pallet racks) in wood and metal buildings
  • Existing buildings on lot
    • Lumberyard since 1950’s
    • Mold issues, asbestos remediation, electrical to code, unveen pad issues
    • Possible other organizations to rehab and locate there
    • Worth quoting to modify that structure?
  • Funding/Logistics Discussions
    • Discussed property offer amount (negotiation figures redacted)
    • Attorney costs, 1-4 hrs for purchase documents, written offer with terms
    • Cost of demoing and removing existing structures
    • Operating budget stays the same past 3 years, can we lower down and use money for deposit on property
    • Board approval and 5-10% contingency fund on hand
    • If cost too high on full buildout per sq ft, frame it out and makerspace finish? OK metal/wood, need more work in Main
    • Loan APR 4.5% on USDA? Get actual #’s
    • Current money market account pays for rent completely
    • Structure pricing with 60% of actual memberships?
    • Artist Studio costs? $250/month proposed or sliding scale?
    • Paid on site personnel or another organization? Grant opportunity to support that?
    • Makerspace membership included in artist studio rent monthly
    • Determine what new membership cost may need to be raised to
    • Finishing room remains outside buildings due to safety and insurance requirements. Move current shed
    • Pinecroft studio for artists on way to Pinnacles. Check with Don Weber on costs/partnership?
    • Check with Vedco and other company for quoting buildings
    • Tie down wood and metal shop sizes and layouts with a larger team

Follow-Up Notes (April 20, 2026 — Katie Startzman)

  • Do we have a current quote from Vetco?
  • Reached out to Amanda Haney (Berea Codes Dept. director), who offered to chat or join a board meeting for general guidance while developing the site plan.
  • Confirmed next step: rough floor plan / equipment layout planning to confirm building size and shape needs.