New Building Meetings/2026-04-15
New Building Meeting (April 15, 2026). Back to all new building meetings.
Meeting Notes
Key Takeaways/Action Items:
- Secure a lawyer to review project and create a purchase agreement for Lester St
- Business plan created for Makerspace. Current funds, current outflow, projected
- Contact USDA/Brownfield for loan options
- Investigate partnerships with local organizations for property
- Complete Contractor layouts for estimated building prices
Notes:
- Discussed funding amounts currently in bank accounts (balances redacted)
- Building Layout/Logistics
- Lot determined to be 141’ x 270’
- Power easement on north side of lot from power pole, 10’ each side of pole
- Possibly swap bathroom in main building from corner to Storage area
- Remove hallway and move meeting room to front of building
- Separate entrances for main meeting room (rentable) and Makerspace/Artist Studios
- Rename artist studios to flex rooms
- Project storage areas determined. Pallet racks/cubbies, etc
- Add dirty bathroom with sink/drain for each building for project cleanup
- Determine how many bathrooms are needed to meet code requirements for occupancy
- Flip Mechanical HVAC room in woodshop to bottom of building so HVAC systems close together for service
- Min 10’ doors or 12’ with bollards for all overheads in wood/metal buildings
- Add project storage (pallet racks) in wood and metal buildings
- Existing buildings on lot
- Lumberyard since 1950’s
- Mold issues, asbestos remediation, electrical to code, unveen pad issues
- Possible other organizations to rehab and locate there
- Worth quoting to modify that structure?
- Funding/Logistics Discussions
- Discussed property offer amount (negotiation figures redacted)
- Attorney costs, 1-4 hrs for purchase documents, written offer with terms
- Cost of demoing and removing existing structures
- Operating budget stays the same past 3 years, can we lower down and use money for deposit on property
- Board approval and 5-10% contingency fund on hand
- If cost too high on full buildout per sq ft, frame it out and makerspace finish? OK metal/wood, need more work in Main
- Loan APR 4.5% on USDA? Get actual #’s
- Current money market account pays for rent completely
- Structure pricing with 60% of actual memberships?
- Artist Studio costs? $250/month proposed or sliding scale?
- Paid on site personnel or another organization? Grant opportunity to support that?
- Makerspace membership included in artist studio rent monthly
- Determine what new membership cost may need to be raised to
- Finishing room remains outside buildings due to safety and insurance requirements. Move current shed
- Pinecroft studio for artists on way to Pinnacles. Check with Don Weber on costs/partnership?
- Check with Vedco and other company for quoting buildings
- Tie down wood and metal shop sizes and layouts with a larger team
Follow-Up Notes (April 20, 2026 — Katie Startzman)
- Do we have a current quote from Vetco?
- Reached out to Amanda Haney (Berea Codes Dept. director), who offered to chat or join a board meeting for general guidance while developing the site plan.
- Confirmed next step: rough floor plan / equipment layout planning to confirm building size and shape needs.