February 2024 Board Meeting. Back to all board meetings.
Meeting Notes
Building updates
- Search for a new building
- Hicks Lumber is the last, best option for us
- Need to find opportunity to talk to west family about this
- Does not seem to be a property they’re planning on utlizing. Selling or collaborating with us might be financially beneficial to them. Shuffled between llcs in the past few years.
- Building needs to be torn down, realistically. Evidence of emergency maintenance inside and thats it.
- Assuming 100k/acre for commercial property, we might be able to do this under under 400k (would probably need to raise 500 to secure us through a year or two of insurance / taxes / other stuff)
- Phil Poulter -
- Civil engineer / construction engineer
- 400million total volume
- Helps build big stuff
- Hicks Building - great location
- Some bones there, 4500ish of building with a roof left, but roof would need to be replaced
- lots of termite damage
- lot of supports not suitable for a modern building
- second half of the building is partially demolished
- last used in maybe 2017?
- secondary structures looked good
- elevation changes / stepped slabs in the building
- could maybe renovate with 15 volunteers and several months
- not the best choice though
- "structure is past its useful life"
- Site itself has a topographical drop
- walkability on lester is exceptional for berea / college area
- Land costs are the question
- need to value it as just the land we think
- demo costs might not be crazy
- salvageable materials
- some concrete was great, some questionable
- Work continues:
- Big list of projects that still need to be completed this year
- Clean Room
- Work done on printer enclosure and printing area. finally have stuff going up on the HSW
- Metal Shop
- Welding exhaust
- Purchased piece for Barnett to install
- Still cannot get them to schedule this! Do we reach out to our property manager at this point?
- Welding exhaust
- Finishing booth
- Finishing ceiling insulation, will put in exhaust and intake next
- Woodshop changes
- Check whiteboard for more
- We have two whiteboards with stuff to do now! Metal Shop and the clean room
- Clean Room
- Big list of projects that still need to be completed this year
Grant Updates
- Mountain Association
- New website launch! Backend launched!
- Almost moved everyone over.
- Wiki still WIP
- New website launch! Backend launched!
Collaboration
- ACM / PWA / Berea Makerspace Skillshare 2024 - June 22nd
- Rita and the Robot Team - no further info yet
- Still no info
- Hammer in - May, first saturday, Jeff Farmer
- Event Poster prepared, will be printed this week
Other
- Board Election
- When does this take place?
- When do we start advertising this?
- Cleanup day - Sunday, March 3rd
- Robin -
- Financial - Nich
- Internship opportunity - Brian Ramsay mentioned this before, but Heidi has someone in mind with an interest in making and social media stuff.
- Kirsten Fuson
- Engineering technology and design student
- hopeful about doing an internship with the makerspace
- family nearby
- knows dan and heidi
- minimum 8 weeks
- supervision required, but not full 40 hour a week
- beginning of the week, end of the week checkin
- one day that’s one - on - one training
- clear goal for the 8 weeks, not just grunt work
- doesn’t need meticulous work plan though
- https://www.beyondberea.org/channels/internship-employers-and-supervisors/
- Heidi can assist with supervision
Recording