New Building Meetings/2026-02-18
From Berea Makerspace Wiki
Building Layout Meeting & KSD Funding Notes. Back to all new building meetings.
Meeting Notes
Zones
- Woodshop
- CNC Router (separated physically)
- Man door and garage door
- Sink
- Air
- Front awning / overhang over doors
- Metalshop
- CNC Plasma (Separate physically for dust)
- Sink / Water access for tools that might need it like plasma table refill
- Air
- Propane hookup (large tank outside? Multiple small with manifold?)
- Front awning / overhang over doors
- Large awning could let us remove existing lean-to on east side of property
- Multi-Function Room
- Assembly projects, maybe where ceramics ends up or future craft that need their own space
- Kitchenette - fridge, commercial sink, counter top, some storage, oven or toaster oven?
- "Clean Room" - Space specifically for events, classes, gathering space
- Main entrance to makerspace; front desk or equivalent in this space?
- Laser / 3DP - adjacent to this space. Exhaust, air, sound dampening, but access through the clean room
- Bathroom - the "nice" bathroom connects here. Aim for one large, family sized, ADA accessible restroom. Two if required
- Artist Studios
- 6-10, 10x10 spaces
- air conditioned, with light, one 20a outlet
- not intended for power tools or things better done in the wood or metal shops
- open stalls, or locked spaces? have seen demand for both
- not a living space. not junk storage.
Things we need to consider
- Building type
- Wood pole barn probably out of the question, unless one company is willing to build out alongside the metal buildings
- Ceramics
- Has been in demand / requested by members and potential members for several years
- The majority of the folk using Lexington makerspace for ceramics are in Richmond ;)
- Some equipment already acquired - purchased kiln from kiln time two years ago
- Bugz has concern with stepping on Bobtown Arts' toes with this, however
- We'll have a meeting with them soon on their thoughts, we've had good relations with them in the past
- Has been in demand / requested by members and potential members for several years
- Building connection / layout
- Separate buildings connected by awning
- Physically separated HVAC, Dust, noise, Fire, insurance concerns
- Adjacent buildings could still be serviced with one multi-head heat pump
- Still rain protected between buildings
- Makes overall structure more expensive (metal truss / siding / awnings / insulation, but hopefully made up for by the other savings and the safety aspects.
- Will have to discuss with code about distance between buildings required.
- Separate buildings connected by awning
- A second floor in the clean room area
- More storage for studios, shared workspace, etc
- ADA accessibility an issue. If we require an elevator for it, too expensive
- Increased HVAC costs (though it could be multizones like the rest of the project)
- Parking
- Can we waive minimum parking requirements? Are there minimum parking requirements?
- We want to push parking to edges. Can we get an agreement to allow formal parking in front of railroad building, on street, in front of Doug's place?
- If we want arranged parking spaces on property - minimum 20' in from edge of property (example below)
- Future projects:
- Commercial kitchen - community members like Laura Kallmeyer had interest in having a space to do their work. Other groups have tried to get a community commercial kitchen started as well
- Out of scope for current buildout, but If we recover the space from the current building on property, that could be the project of a future grant.
- Saw mill / wood drying
- Possible use for southern most lean-to
- Concrete pad, but structure needs assessment
- Commercial kitchen - community members like Laura Kallmeyer had interest in having a space to do their work. Other groups have tried to get a community commercial kitchen started as well
Vendors to reach out to
- Buck Steel
- Icon steel buildings
- KY Steel
- Johns Metal Build Contractor
KSD Funding Notes
Helping us figure out how much we have, when, for this project. Tom Cook has full documentation if needed
- ~100k - initial request
- has been used to fund equipment purchases for reimbursement later
- 25k annually - maintenance
- 45k annually - programming (~3 one day classes a year to teach new skills / projects to do with the tools we've provided through this program)
- ~387k - equipment purchases pass-through
- Not all may be spent, but does not affect what we get
- 50k- miscellaneous expenses we were not able to bill for originally
Current account balances redacted.
- one more large purchase round to go
- Will be reimbursed, plus maintenance, programming, and misc expenses this year.
- Support / programming covers 2026, 27, 28