New Building Meetings/2026-02-18

From Berea Makerspace Wiki
Revision as of 17:53, 25 November 2026 by Zapf (talk | contribs) (Embed site plans, layout diagrams, and 2024 meeting slides/attachments)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Building Layout Meeting & KSD Funding Notes. Back to all new building meetings.

Meeting Notes

Zones

  • Woodshop
    • CNC Router (separated physically)
    • Man door and garage door
    • Sink
    • Air
    • Front awning / overhang over doors
  • Metalshop
    • CNC Plasma (Separate physically for dust)
    • Sink / Water access for tools that might need it like plasma table refill
    • Air
    • Propane hookup (large tank outside? Multiple small with manifold?)
    • Front awning / overhang over doors
      • Large awning could let us remove existing lean-to on east side of property
  • Multi-Function Room
    • Assembly projects, maybe where ceramics ends up or future craft that need their own space
    • Kitchenette - fridge, commercial sink, counter top, some storage, oven or toaster oven?
  • "Clean Room" - Space specifically for events, classes, gathering space
    • Main entrance to makerspace; front desk or equivalent in this space?
    • Laser / 3DP - adjacent to this space. Exhaust, air, sound dampening, but access through the clean room
    • Bathroom - the "nice" bathroom connects here. Aim for one large, family sized, ADA accessible restroom. Two if required
  • Artist Studios
    • 6-10, 10x10 spaces
    • air conditioned, with light, one 20a outlet
      • not intended for power tools or things better done in the wood or metal shops
    • open stalls, or locked spaces? have seen demand for both
    • not a living space. not junk storage.

Things we need to consider

  • Building type
    • Wood pole barn probably out of the question, unless one company is willing to build out alongside the metal buildings
  • Ceramics
    • Has been in demand / requested by members and potential members for several years
      • The majority of the folk using Lexington makerspace for ceramics are in Richmond ;)
    • Some equipment already acquired - purchased kiln from kiln time two years ago
    • Bugz has concern with stepping on Bobtown Arts' toes with this, however
      • We'll have a meeting with them soon on their thoughts, we've had good relations with them in the past
  • Building connection / layout
    • Separate buildings connected by awning
      • Physically separated HVAC, Dust, noise, Fire, insurance concerns
      • Adjacent buildings could still be serviced with one multi-head heat pump
      • Still rain protected between buildings
      • Makes overall structure more expensive (metal truss / siding / awnings / insulation, but hopefully made up for by the other savings and the safety aspects.
      • Will have to discuss with code about distance between buildings required.
  • A second floor in the clean room area
    • More storage for studios, shared workspace, etc
    • ADA accessibility an issue. If we require an elevator for it, too expensive
    • Increased HVAC costs (though it could be multizones like the rest of the project)
  • Parking
    • Can we waive minimum parking requirements? Are there minimum parking requirements?
    • We want to push parking to edges. Can we get an agreement to allow formal parking in front of railroad building, on street, in front of Doug's place?
    • If we want arranged parking spaces on property - minimum 20' in from edge of property (example below)
  • Future projects:
    • Commercial kitchen - community members like Laura Kallmeyer had interest in having a space to do their work. Other groups have tried to get a community commercial kitchen started as well
      • Out of scope for current buildout, but If we recover the space from the current building on property, that could be the project of a future grant.
    • Saw mill / wood drying
      • Possible use for southern most lean-to
      • Concrete pad, but structure needs assessment

Vendors to reach out to

KSD Funding Notes

Helping us figure out how much we have, when, for this project. Tom Cook has full documentation if needed

  • ~100k - initial request
    • has been used to fund equipment purchases for reimbursement later
  • 25k annually - maintenance
  • 45k annually - programming (~3 one day classes a year to teach new skills / projects to do with the tools we've provided through this program)
  • ~387k - equipment purchases pass-through
    • Not all may be spent, but does not affect what we get
  • 50k- miscellaneous expenses we were not able to bill for originally

Current account balances redacted.

  • one more large purchase round to go
    • Will be reimbursed, plus maintenance, programming, and misc expenses this year.
  • Support / programming covers 2026, 27, 28

Diagrams and Reference Images