New Building Meetings: Difference between revisions
Jump to navigation
Jump to search
Remove dead 2018-2021 red links on Meetings and update cross-references |
Embed site plans, layout diagrams, and 2024 meeting slides/attachments |
||
| Line 20: | Line 20: | ||
|date=2026-02-18 | |date=2026-02-18 | ||
|title=Building Layout Meeting & KSD Funding Notes | |title=Building Layout Meeting & KSD Funding Notes | ||
|files=Notes | |files=Notes · Diagrams | ||
}} | }} | ||
|} | |} | ||
| Line 61: | Line 61: | ||
}} | }} | ||
|} | |} | ||
== Site Plans, Layouts, and Zoning == | |||
<gallery mode="packed" heights="220px"> | |||
New_Building_Makerspace_2.0_Floor_Plan.png|Makerspace 2.0 conceptual floor plan (Wood Shop, Metal Shop, Main Building) | |||
New_Building_Makerspace_2.0_Lester_St_Overlay.jpg|Makerspace 2.0 layout overlaid on 205 Lester Street lot | |||
New_Building_Lester_St_Half_Lot_Diagram.jpg|205 Lester Street half-lot footprint diagram (5,000 sq ft + 2,500 sq ft future) | |||
New_Building_Lester_St_Plat_Sketch.jpg|205 Lester Street plat and lot dimensions sketch (141 ft depth) | |||
New_Building_Lester_St_Zoning_B2_Map.jpg|City of Berea zoning map showing 205 Lester Street in B-2 zone | |||
New_Building_Lester_St_Building_Footprints.jpg|205 Lester Street existing structure square-footage and condition markup | |||
New_Building_Lester_St_Lot_Measurement.jpg|205 Lester Street aerial lot measurement along Oak Street | |||
</gallery> | |||
[[Category:New Building Meetings]] | [[Category:New Building Meetings]] | ||
Revision as of 17:53, 25 November 2026
General Information
This is the archive of Berea Makerspace new building planning and layout meeting notes (Poke Boat building, Robin Taffler planning sessions, and the 205 Lester Street project), newest first. Each date links to the meeting's page on this wiki.
See Board Meetings for board meeting notes (February–April 2026 board business was combined with new building meetings) and Meetings for the main meetings directory.
2026
| Date | Meeting | Contents |
|---|---|---|
| 2026-04-15 | New Building Meeting (April 15, 2026) | Notes |
| 2026-02-18 | Building Layout Meeting & KSD Funding Notes | Notes · Diagrams |
2024
| Date | Meeting | Contents |
|---|---|---|
| 2024-05-13 | Robin Taffler Meeting (May 13, 2024) | Notes · Chat log |
| 2024-03-28 | Robin Taffler Meeting (March 28, 2024) | Notes |
2022
| Date | Meeting | Contents |
|---|---|---|
| 2022-09-01 | Poke Boat Building Meeting | Notes |
| 2022-08-04 | Poke Boat Pre-Construction Meeting | Notes |
Site Plans, Layouts, and Zoning
-
Makerspace 2.0 conceptual floor plan (Wood Shop, Metal Shop, Main Building)
-
Makerspace 2.0 layout overlaid on 205 Lester Street lot
-
205 Lester Street half-lot footprint diagram (5,000 sq ft + 2,500 sq ft future)
-
205 Lester Street plat and lot dimensions sketch (141 ft depth)
-
City of Berea zoning map showing 205 Lester Street in B-2 zone
-
205 Lester Street existing structure square-footage and condition markup
-
205 Lester Street aerial lot measurement along Oak Street