Board Meetings/2024-09-28: Difference between revisions

From Berea Makerspace Wiki
Add missing Board Meetings (2022-2026) and New Building Meetings archive from Slack
 
Embed site plans, layout diagrams, and 2024 meeting slides/attachments
 
Line 86: Line 86:
** Schedule meeting with Jasmine Jones at BC re: Makerspace collaboration (Brian Ramsay, all interested board members to attend)
** Schedule meeting with Jasmine Jones at BC re: Makerspace collaboration (Brian Ramsay, all interested board members to attend)
** Provide notes from meeting with Judy Sizemore re: Matrix (Brian Ramsay)
** Provide notes from meeting with Judy Sizemore re: Matrix (Brian Ramsay)
== Attachments ==
[[File:Board_Meeting_2024-09-28_Juki_Sewing_Email.png|550px|thumb|none|Email thread with Lydia Kitts regarding Juki industrial sewing machines (phone redacted)]]


[[Category:Board Meetings]]
[[Category:Board Meetings]]

Latest revision as of 17:53, 25 November 2026

September 2024 Board Meeting. Back to all board meetings.

Meeting Notes

  • Kiana not present for September Meeting, notes taken by Heidi and Jess instead
  • Mountain Association Matrix Meeting (Jess + Brian)
    • JE + BR met w/Judy Sizemore 9/19 for Matrix Organizational Assessment. There are follow-up emails to send + JE will deliver copy of notes from Judy once available. JE + BR signed paperwork to continue along w/receiving recommendations for other grant opportunities.
    • BR impressed w/Judy's involvement and noted Judy's suggestion to focus on foundations vs grant opportunities, as foundations can provide operational costs.
    • As aside - PP mentions Bechtel (sp? army depot related) in Richmond who is currently providing grant $ to small orgs.
    • Two main action points to pursue soon:
      • Document to state service to allow them to solicit funds
      • Need to get Guidestar status to gold. Remaining areas: demographic data + financial data
  • Follow up from last month:
    • 6) Phil-Fabric/Arts Topic
      • Official request for Juki sewing machine (industrial) and to move one of the Bernina's out of the space (the one w/o manual).
      • Fundraise / crowdfunding campaign
      • Organized space with orientation would be great, but we will need to find space and volunteers
      • FORWARDED TO NEXT MONTH
  • Birthday Party / Open House / Other outreach updates
    • Official time 4-6, but Phil + Heidi will be there @10am, Jess there @12pm,
    • Food confirmed: Half sheet from Brandi's (serves 20), donation of food from Katie Startzman(sp?), pizza tbd.
      • JM asks about food truck (Bert's). JE considers that excessive at this time for officially 2 hour event, but potential for future skillshare?
    • Demos / Make + Take
      • confirmed: Phil (fiber laser), Jeff (plasma), Hank (? who knows could be anything ?), Heidi (laser + preprep minis for painting), Caleb Costello (can cover wood shop)
      • needed: CNC router (JE suggests big job and let it run)
    • Other roles: JE + BR covering talking + membership sign-up.
  • KSD Proposal
    • NS asks if the doc signed last week was the actual contract. JE asserts that no, it was not the actual contract. JM provides context re: outside convo w/Tom that doc was agreement for BMS to be under contract with KSD. Re: payments being reimbursed language - language in there for documentation's sake, but actual process will happen w/Tom.
    • JE: Buffer MBS provides is not much, esp w/actual labor involved. JM: BMS should not be out-of-pocket w/anything.
    • NS: Timeline? JM: Yes + no, based on convo w/Tom. Equipment will be bought ASAP to be w/in fiscal year but programming will not start until later.
    • As Tom not present for discussion, further discussion for time being will take place in Slack chat + emails.
  • Moving Orientations back to fixed schedule
    • Jess: Will discuss in #class-planning
  • IRS issue
    • NS: JE found delayed letter with fine from IRS re: tax returns sent 6 weeks late due to misunderstanding re: deadlines. However, there is a first-time penalty abatement that requires a letter sent in. This underscores NS's desire to get formal accountant involved for KSD proposal.
    • JM: No official knowledge but has heard good things about Steve Davis re: accountant firm. BR also rec's Steve Davis.
  • Building stuff
    • Power upgrade - Plasma circuit
      • Circuit for plasma is under-amped, 20amp when it should be 30(min) or 40. Looking for source for 6gauge wire to convert. Goal to get done before open house.
      • JM: Plug for plasma itself, where it is being upgraded to 50amp,(nema 6-50) would like plug moved out from under table to mounted on wall. In short: shouldn't be under the table.
      • Feed for Lotus (sp?) is 240.
      • Longterm upgrades to plasma would need to be hypertherm (sp?). Would be roughly $3500 upgrade, per JM. (https://bakersgas.com/products/hypertherm-088584?variant=41338755219558)
    • The not a shed update
      • JE has continued to work on not-a-shed. Majority of woodwork done, insulation covered. Main part left is intake hole, filters. Goal is to finish structure and then submit report to KY Colonels.
      • PP notes that if shed is ever moved, it will need to be moved on trailer w/3 axels not 2.
  • First Robotics, Berea College, and us
    • Context: First Robotics is HS robotics team open to highschoolers in local area. Partnered with CELTS @ Berea College and BMS is official community partner, but we have not actually participated. Rita Payne is adult leading the group (possibly not - per conversation w/JE). FR could use some top-level leadership with technical and project management experience.
    • Currently, FR has fabrication needs not met by current facilities. Berea College students helping with FR are all over 18 and would be the ones actually operating equipment w/memberships paid for by BC's CS dept. BR suggests only the BC students actually fabricating get memberships, Scott Heggen (head of CS at BC) suggests all volunteers get membership regardless of assigned to fabrication.
    • Students with memberships paid for by the CS Department
    • HS students not allowed to operate.
    • Need child waiver alternative - Juno?
      • Context: in spring of 2019, KY Supreme Court ruled that child waivers are useless (and that that's why businesses have insurance). BR suggests plain language waiver that outlines potential dangers at Makerspace that parents would sign.
      • Possibility - liability insurance for specific events or teachers. unsure if our insurance covers children or events. Directors and operators insurance would cover personal lawsuits and should be pursued. BR will reach out to our insurance about it.
  • Discounted Memberships
    • Short term - Student Membership option
      • Juno will be tabling at Mtn Day at the college to make BC college students aware.
      • AS - The Labor program could potentially pay for memberships for students who can tie their training and work at the makerspace to their labor position.
      • AS - We could keep the student tier at one rate, but have another accessible/scholarship tier where a member would keep track of their work and write up how it has enabled them to do new things.
      • Decided $20 is a good student rate to start with
    • Long term - Discount for any membership with volunteering?
      • Discuss at a later date
    • Long term - Business sponsored memberships
      • Discuss at a later date
    • 3 Month trial - would like approval for policy change (all future signups will be turned into standard, recurring memberships, with appropriate language included in the website)
      • All agreed
  • Jasmine Jones: Berea college makerspace partnership possibility
    • JM had convo w/JJ at Spoonbread: JJ wants to upgrade BC's Makerspace's equipment and is interested in Makerspace members offering classes to BC students (members will be paid). Lightly touched on shuttle service, to be funded with BC funds. JM would like to have meeting w/JJ and any other interested Board members at the college to discuss potential collaboration.
  • ACTION ITEMS
    • Fil 990 with Attorney General (Nicholas Scoville)
    • Guidestar status to Gold (Jess)
      • 9-26 - Financials completed, waiting on people to submit demographic data
    • Reach out to Jeff Farmer re: Hammer In (Jess)
      • Other conflicting blacksmithing events in nov/december, will be talking about next year however
    • Discuss moving classes to fixed schedules (Headed by Jess in channel)
    • Demos confirmed / materials + food acquired for Open House (All members)
      • Cake ordered, looking at pizza (9-26)
    • Upgrade Plasma amps before Open House (Jess?)
      • update after wednesday (Jess)
      • 9-28: parts have arrived, install happening in the coming week
    • Discuss possibility of BC sponsoring Makerspace membership for BC students (Heidi)
      • update after wednesday (Heidi)
    • Create official $20 student membership rate (Jess Estridge)
    • Reach out to insurance provider re: director + operators insurance (Brian Ramsay)
    • Schedule meeting with Jasmine Jones at BC re: Makerspace collaboration (Brian Ramsay, all interested board members to attend)
    • Provide notes from meeting with Judy Sizemore re: Matrix (Brian Ramsay)

Attachments

Email thread with Lydia Kitts regarding Juki industrial sewing machines (phone redacted)