<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.bereamakerspace.org:443/index.php?action=history&amp;feed=atom&amp;title=New_Building_Project</id>
	<title>New Building Project - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.bereamakerspace.org:443/index.php?action=history&amp;feed=atom&amp;title=New_Building_Project"/>
	<link rel="alternate" type="text/html" href="https://wiki.bereamakerspace.org:443/index.php?title=New_Building_Project&amp;action=history"/>
	<updated>2026-11-27T01:42:16Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.45.7</generator>
	<entry>
		<id>https://wiki.bereamakerspace.org:443/index.php?title=New_Building_Project&amp;diff=12986&amp;oldid=prev</id>
		<title>Zapf: Create New Building Project overview page (205 Lester Street / Makerspace 2.0)</title>
		<link rel="alternate" type="text/html" href="https://wiki.bereamakerspace.org:443/index.php?title=New_Building_Project&amp;diff=12986&amp;oldid=prev"/>
		<updated>2026-11-26T03:40:06Z</updated>

		<summary type="html">&lt;p&gt;Create New Building Project overview page (205 Lester Street / Makerspace 2.0)&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;== General Information ==&lt;br /&gt;
&lt;br /&gt;
Berea Makerspace has operated in a leased 2,500 sq ft facility at 116 Spring Circle Drive, Suite 3 since August 2019. The &amp;#039;&amp;#039;&amp;#039;New Building Project&amp;#039;&amp;#039;&amp;#039; (also referred to in planning notes as &amp;#039;&amp;#039;&amp;#039;Makerspace 2.0&amp;#039;&amp;#039;&amp;#039;) is the organization&amp;#039;s multi-year effort to acquire and build out a permanent, larger, and more accessible workshop in central Berea.&lt;br /&gt;
&lt;br /&gt;
Our current focus is the former Hicks Lumber property at &amp;#039;&amp;#039;&amp;#039;205 Lester Street&amp;#039;&amp;#039;&amp;#039; in Berea. Moving into town reduces the need for a vehicle to reach the space, expands dedicated room for woodworking, metalworking, digital fabrication, and classes, adds studio and community-gathering space, and puts a long-vacant commercial lot back into productive community use.&lt;br /&gt;
&lt;br /&gt;
For detailed meeting notes from 2022 through 2026, see [[New Building Meetings]]. For related governance decisions, see [[Board Meetings]] and [[Structure]].&lt;br /&gt;
&lt;br /&gt;
== Site Overview: 205 Lester Street ==&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot;&lt;br /&gt;
|-&lt;br /&gt;
! Detail&lt;br /&gt;
! Information&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Address&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| 205 Lester Street, Berea, KY 40403&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Parcel ID&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| B006-0006-0010 (Madison County PVA; New Berea Lots 5–13)&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Lot Size&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| Approximately 0.67 acres (roughly 141&amp;#039; × 270&amp;#039;)&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Zoning&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| City of Berea B-2 (Commercial)&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Former Use&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| Commercial lumberyard from the 1950s through 2014 (Hicks Lumber, 1991–2014); unoccupied since 2014&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Existing Structures&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| Three one-story structures totaling roughly 9,200 sq ft (a ~6,700 sq ft main building with ~4,500 sq ft enclosed and storm/roof damage, plus two open lean-tos of ~1,500 sq ft and ~1,000 sq ft)&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;&amp;#039;Environmental Review&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| Kentucky Brownfield Program Targeted Site Assessment (Phase I) planned to evaluate existing conditions prior to renovation or demolition&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
== Planned Facility Layout ==&lt;br /&gt;
&lt;br /&gt;
Layout plans are working concepts that will be refined based on environmental assessment results, City of Berea code requirements, and contractor estimates. Current planning focuses on the following zones:&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Wood Shop:&amp;#039;&amp;#039;&amp;#039; Expanded woodworking area with a physically separated [[CNC Router]] room for dust and noise control, overhead and man doors, sink, compressed air, pallet-rack project storage, and a covered front awning.&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Metal Shop:&amp;#039;&amp;#039;&amp;#039; Expanded welding, forging, and fabrication area with a physically separated [[CNC Plasma Table]] room, water access, compressed air, exterior propane hookup, overhead door, and a covered front awning.&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Clean Room and Digital Fabrication:&amp;#039;&amp;#039;&amp;#039; Main public entrance, gathering and classroom space, ADA-accessible restroom(s), and an adjacent exhausted, sound-dampened area for lasers and 3D printers.&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Multi-Function Room:&amp;#039;&amp;#039;&amp;#039; Flexible assembly and workshop room, kitchenette, and potential space for additional crafts such as ceramics.&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Artist Studios / Flex Rooms:&amp;#039;&amp;#039;&amp;#039; Proposed 6 to 10 climate-controlled studio spaces (roughly 10&amp;#039; × 10&amp;#039; each) for working artists and makers.&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Outdoor Finishing Shed:&amp;#039;&amp;#039;&amp;#039; Relocating the existing ventilated paint and stain finishing shed outside the main buildings for safety and insurance compliance.&lt;br /&gt;
&lt;br /&gt;
Planners are evaluating separate metal shop buildings connected by covered awnings (to separate dust, noise, fire risk, and HVAC) alongside whether any existing concrete pads or lean-to structures on the lot can be reused. Longer-term ideas noted for future phases or partner grants include solar and energy-efficiency upgrades with Mountain Association, native landscaping, a community tool library, a sawmill/wood-drying area, and a shared commercial kitchen.&lt;br /&gt;
&lt;br /&gt;
== Site Plans and Conceptual Layouts ==&lt;br /&gt;
&lt;br /&gt;
&amp;lt;gallery mode=&amp;quot;packed&amp;quot; heights=&amp;quot;220px&amp;quot;&amp;gt;&lt;br /&gt;
New_Building_Makerspace_2.0_Floor_Plan.png|Makerspace 2.0 conceptual floor plan (Wood Shop, Metal Shop, Main Building)&lt;br /&gt;
New_Building_Makerspace_2.0_Lester_St_Overlay.jpg|Conceptual layout overlaid on the 205 Lester Street lot&lt;br /&gt;
New_Building_Lester_St_Half_Lot_Diagram.jpg|205 Lester Street half-lot footprint diagram (5,000 sq ft initial + 2,500 sq ft future)&lt;br /&gt;
New_Building_Lester_St_Zoning_B2_Map.jpg|City of Berea zoning map showing 205 Lester Street in B-2 zone&lt;br /&gt;
&amp;lt;/gallery&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Additional plat sketches, lot measurements, and parking diagrams are archived on [[New Building Meetings]].&lt;br /&gt;
&lt;br /&gt;
== Project Timeline ==&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot; style=&amp;quot;width: 100%&amp;quot;&lt;br /&gt;
|-&lt;br /&gt;
! Period&lt;br /&gt;
! Milestone&lt;br /&gt;
|-&lt;br /&gt;
| 2022–2023&lt;br /&gt;
| Explored relocating to the former Poke Boat building on Broadway, including layout planning and pre-construction meetings. After that option did not move forward, members evaluated other commercial properties around Berea.&lt;br /&gt;
|-&lt;br /&gt;
| 2024&lt;br /&gt;
| Worked with grant consultant Robin Taffler on community-impact narrative, outreach strategy, and partner alignment; began evaluating the Lester Street lumberyard property.&lt;br /&gt;
|-&lt;br /&gt;
| Late 2025&lt;br /&gt;
| Board members and community partners toured 205 Lester Street to assess existing structures, lot layout, and shared community-use possibilities.&lt;br /&gt;
|-&lt;br /&gt;
| Early 2026&lt;br /&gt;
| Held layout and planning meetings (February and April 2026) to define shop zones, code and parking requirements, and conceptual Makerspace 2.0 footprints; prepared a Kentucky Brownfield Program Targeted Site Assessment (Phase I) application.&lt;br /&gt;
|-&lt;br /&gt;
| May–November 2026&lt;br /&gt;
| Board passed a resolution authorizing an Option to Purchase Real Estate agreement for 205 Lester Street (May 2026) and reviewed amended option terms incorporating brownfield assessment access (August–October 2026); the option agreement has not yet been signed. Organizational readiness and financing work—including USDA Community Facilities loan preparation—are ongoing.&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
== How to Get Involved ==&lt;br /&gt;
&lt;br /&gt;
This is a volunteer-led effort and welcomes input from members and community partners.&lt;br /&gt;
&lt;br /&gt;
* Join the #new-building channel on [[Slack]] for ongoing updates and layout discussions.&lt;br /&gt;
* Attend open board and building planning meetings listed on [[Meetings]] and announced in [[Slack]].&lt;br /&gt;
* Reach out at [mailto:info@bereamakerspace.org info@bereamakerspace.org] if you can help with shop layout planning, construction/contractor estimates, grant research, or community partnerships.&lt;br /&gt;
* Support Berea Makerspace directly at [https://bereamakerspace.org/donate bereamakerspace.org/donate].&lt;br /&gt;
&lt;br /&gt;
== Related Pages ==&lt;br /&gt;
&lt;br /&gt;
* [[New Building Meetings]]&lt;br /&gt;
* [[Board Meetings]]&lt;br /&gt;
* [[Projects]]&lt;br /&gt;
* [[Grants]]&lt;br /&gt;
* [[Structure]]&lt;/div&gt;</summary>
		<author><name>Zapf</name></author>
	</entry>
</feed>