<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.bereamakerspace.org:443/index.php?action=history&amp;feed=atom&amp;title=New_Building_Meetings%2F2026-04-15</id>
	<title>New Building Meetings/2026-04-15 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.bereamakerspace.org:443/index.php?action=history&amp;feed=atom&amp;title=New_Building_Meetings%2F2026-04-15"/>
	<link rel="alternate" type="text/html" href="https://wiki.bereamakerspace.org:443/index.php?title=New_Building_Meetings/2026-04-15&amp;action=history"/>
	<updated>2026-11-28T07:45:22Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.45.7</generator>
	<entry>
		<id>https://wiki.bereamakerspace.org:443/index.php?title=New_Building_Meetings/2026-04-15&amp;diff=12938&amp;oldid=prev</id>
		<title>Zapf: Add missing Board Meetings (2022-2026) and New Building Meetings archive from Slack</title>
		<link rel="alternate" type="text/html" href="https://wiki.bereamakerspace.org:443/index.php?title=New_Building_Meetings/2026-04-15&amp;diff=12938&amp;oldid=prev"/>
		<updated>2026-11-25T16:04:29Z</updated>

		<summary type="html">&lt;p&gt;Add missing Board Meetings (2022-2026) and New Building Meetings archive from Slack&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&amp;#039;&amp;#039;New Building Meeting (April 15, 2026). Back to [[New Building Meetings|all new building meetings]].&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
== Meeting Notes ==&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Key Takeaways/Action Items:&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
# Secure a lawyer to review project and create a purchase agreement for Lester St&lt;br /&gt;
# Business plan created for Makerspace. Current funds, current outflow, projected&lt;br /&gt;
# Contact USDA/Brownfield for loan options&lt;br /&gt;
# Investigate partnerships with local organizations for property&lt;br /&gt;
# Complete Contractor layouts for estimated building prices&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Notes:&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
* Discussed funding amounts currently in bank accounts (balances redacted)&lt;br /&gt;
* Building Layout/Logistics&lt;br /&gt;
** Lot determined to be 141’ x 270’&lt;br /&gt;
** Power easement on north side of lot from power pole, 10’ each side of pole&lt;br /&gt;
** Possibly swap bathroom in main building from corner to Storage area&lt;br /&gt;
** Remove hallway and move meeting room to front of building&lt;br /&gt;
** Separate entrances for main meeting room (rentable) and Makerspace/Artist Studios&lt;br /&gt;
** Rename artist studios to flex rooms&lt;br /&gt;
** Project storage areas determined. Pallet racks/cubbies, etc&lt;br /&gt;
** Add dirty bathroom with sink/drain for each building for project cleanup&lt;br /&gt;
** Determine how many bathrooms are needed to meet code requirements for occupancy&lt;br /&gt;
** Flip Mechanical HVAC room in woodshop to bottom of building so HVAC systems close together for service&lt;br /&gt;
** Min 10’ doors or 12’ with bollards for all overheads in wood/metal buildings&lt;br /&gt;
** Add project storage (pallet racks) in wood and metal buildings&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Existing buildings on lot&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
** Lumberyard since 1950’s&lt;br /&gt;
** Mold issues, asbestos remediation, electrical to code, unveen pad issues&lt;br /&gt;
** Possible other organizations to rehab and locate there&lt;br /&gt;
** Worth quoting to modify that structure?&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Funding/Logistics Discussions&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
** Discussed property offer amount (negotiation figures redacted)&lt;br /&gt;
** Attorney costs, 1-4 hrs for purchase documents, written offer with terms&lt;br /&gt;
** Cost of demoing and removing existing structures&lt;br /&gt;
** Operating budget stays the same past 3 years, can we lower down and use money for deposit on property&lt;br /&gt;
** Board approval and 5-10% contingency fund on hand&lt;br /&gt;
** If cost too high on full buildout per sq ft, frame it out and makerspace finish? OK metal/wood, need more work in Main&lt;br /&gt;
** Loan APR 4.5% on USDA? Get actual #’s&lt;br /&gt;
** Current money market account pays for rent completely&lt;br /&gt;
** Structure pricing with 60% of actual memberships?&lt;br /&gt;
** Artist Studio costs? $250/month proposed or sliding scale?&lt;br /&gt;
** Paid on site personnel or another organization? Grant opportunity to support that?&lt;br /&gt;
** Makerspace membership included in artist studio rent monthly&lt;br /&gt;
** Determine what new membership cost may need to be raised to&lt;br /&gt;
** Finishing room remains outside buildings due to safety and insurance requirements. Move current shed&lt;br /&gt;
** Pinecroft studio for artists on way to Pinnacles. Check with Don Weber on costs/partnership?&lt;br /&gt;
** Check with Vedco and other company for quoting buildings&lt;br /&gt;
** Tie down wood and metal shop sizes and layouts with a larger team&lt;br /&gt;
&lt;br /&gt;
=== Follow-Up Notes (April 20, 2026 — Katie Startzman) ===&lt;br /&gt;
&lt;br /&gt;
* Do we have a current quote from Vetco?&lt;br /&gt;
* Reached out to Amanda Haney (Berea Codes Dept. director), who offered to chat or join a board meeting for general guidance while developing the site plan.&lt;br /&gt;
* Confirmed next step: rough floor plan / equipment layout planning to confirm building size and shape needs.&lt;br /&gt;
&lt;br /&gt;
[[Category:New Building Meetings]]&lt;/div&gt;</summary>
		<author><name>Zapf</name></author>
	</entry>
</feed>